Main Street Demolition
Project Details
The Eccles Theatre opened in downtown Salt Lake City in the fall of 2016.
Before this stunning theatre could be built, the old buildings needed to be demolished.
Two 550 ton cranes and a 350 ton crane lowered beams that weighed over 200,000 pounds that were suspended 150 feet off the ground.